Monday 21 July 2008

Key concepts in architectural design


When building an airport hotel, consider, if it is at the end of the runway, fitting something a little more sound-proofing than bog standard double glazing.

A bit of a disturbed nights sleep with regular take-offs until well after 11pm, a bed that creaked quite a bit (an achievement in a hotel less than two years old) and air-con that was either off or sounding like a jet engine!

Still, I got up a 5:30 instead of 3am, which I would have to have done if I had come from home.

Very quickly through Check-in, scarily smoothly, something is bound to go pear shaped!

No comments: